Electivire (Mighty)

1/2

Electivire (Mighty)
5.0
1 reviews
USD 1.76
Price is not final
Minimum Purchase:
1
Sold
1 (100%)
Average Delivery Time:
3 hours
Product Description
Please (SKU-LP08)
Electivire (Mighty), is a powered-up version of the regular Electivire, with a higher level that can be found in the wild (lvl36 - lvl40) + good charge move + large size (XL-XXL)
Notes:
- Pokemon level will match the recipient trainer's level +2
- IV will be randomly rerolled by the system during the trade process
- Prepare 20,000 stardust if the Pokemon is not yet registered in your Pokédex
- Please chat first to inquire about available stock levels
Electivire (Mighty), is a powered-up version of the regular Electivire, with a higher level that can be found in the wild (lvl36 - lvl40) + good charge move + large size (XL-XXL)
Notes:
- Pokemon level will match the recipient trainer's level +2
- IV will be randomly rerolled by the system during the trade process
- Prepare 20,000 stardust if the Pokemon is not yet registered in your Pokédex
- Please chat first to inquire about available stock levels
Product Review
5/5
1 Review
5
1
4
0
3
0
2
0
1
0
Product Review
View All5/5
1 Rating
5
1
4
0
3
0
2
0
1
0

No reviews yet for this product rating
SubtotalUSD 1.76
100% Secure Payments Guaranteed by Trade Guard
Still looking for the right offer?
See All Offers